MEETING NOTES
MSCP WORK GROUP
JULY 31, 1998
Agenda Item # 1 - Introductions; Review of Meeting Notes for June 24
- The meeting notes from the June 24, 1998, were approved by a consensus.
- Alana Knaster introduced David Cohen from Trout Unlimited as a new member of the Steering Committee.
- Contacts with several cities, additional tribes and other public interest groups are ongoing.
Agenda Item # 2 - Subcommittee Reports
A - Program Subcommittee The Program Subcommittee recommended that the Work Group not proceed to finalize the "Vision Paper", but instead use the Vision Paper as an outline to follow in the further consideration of key issues. Specific recommendations on how to proceed with two critical issues were as follows:
- Request Paul Seltzer to prepare a paper on the pros and cons of obtaining Section 7 coverage only for the MSCP as compared to a joint Section 7/section 10 coverage (Draft to be submitted by Aug. 14).
- Form a NEPA subcommittee to track a series of issues related to the NEPA process throughout the MSCP process. The subcommittee would begin with the issues addressed in the facilitator's convening report as well as a number of issues suggested by the Program subcommittee
- Direct Ogden to prepare a draft outline of an implementation plan for the MSCP.
The Workgroup concurred with the subcommittee recommendations. The members of the NEPA Subcommittee will include: Bill Werner, chair, Bill Davis, Marty Meisler, Dave Hogan, Michael Remington, Phil Lehr, Fish and Wildlife representative, Tom Shrader, Fred Worthley and Ogden.
B. Biological Subcommittee: Ogden has prepared a "Preliminary Species Conservation Goals" document which was reviewed by the subcommittee on July 30th. Suggested changes to goal statements were developed and will be incorporated into the next draft. The Subcommittee will meet 9/16-17 to discuss species protection and reclamation measures. Fish and plant species will be covered on 9/16 and birds, herpevoirs, and invertebrates will be discussed on 9/17. The meeting will begin at 9:30 AM on 9/16 at the BLM office, 222 N. Central, in Phoenix.
C. Hydrologic Modeling Subcommittee: The Hydrologic Modeling Subcommittee met on 7/17 to discuss modeling requirements for the MSCP. The Hydrologic Modeling criteria paper will be distributed to the HM Subcommittee for review by 8/7. Review of the paper is to be completed on 8/19. The final modeling criteria paper is expected to be ready for the 9/3 Work Group meeting. Consideration is being given to using the Alligator Slough as a pilot project for hydrologic modeling. Other sites will also be selected for site-specific modeling. The Subcommittee will meet on 8/19 from 1:00-4:00 at the Colorado River Commission Building.
D. Project List Subcommittee: Ogden presented a draft Framework for MSCP Plan Development and Program Compliance based upon subcommittee deliberations. The draft framework grouped all projects that would be considered by ESA coverage into four groupings: (1) Current operations and maintenance, and water and power projects, (2) Current conservation and resource management projects, (3) Future water and power projects, and (4) Other projects.
The subcommittee had considered four scenarios for providing coverage and was seeking Workgroup input on how to narrow the options.
Several specific recommendations were fully discussed: (1) Eliminate group 2 projects ( current conservation and resource management projects) from coverage. (2) Develop and implement conservation measures for projects as a group, not on a project-by-project basis (3) inclusion versus exclusion of future unknown projects in the MSCP.
There was some discomfort expressed about utilizing the "Mitigation Banking" metaphor. It was proposed that the group used the term "conservation reservoir" instead. It was recognized that it will be difficult to quantify project impacts and required mitigation . It will be necessary to use "best estimates" and information from some verified efforts. The precise methodology will have to be decided upon at a later date.
There was considerable discussion about excluding Group 2 projects. Although not all conservation and resource management projects may need coverage, there appear to be a considerable number of projects that should be included in the MSCP. The subcommittee was directed to re-examine possible projects under Group 2 for inclusion/exclusion.
The Workgroup proposed the following scenario for further development by the Projects List Subcommittee:
- Current and proposed future projects would be provided for in the Conservation Reservoir ( this would include Groups 1 and 2 ).
- Coverage for unknown future projects of MSCP members would be accommodated in the framework/reservoir - a mechanism for estimating and providing conservation and withdrawing credits would be developed.
- There will be a process to address future projects of non-MSCP members e.g. new subdivisions, shopping centers, hotels..; however, specific mitigation for these projects will not be provided in the reservoir/ MSCP plan. (Development of the process for non-MSCP members was subsequently assigned to the Implementation Subcommittee).
E. Short-Term Funding Subcommittee: Because of grant decisions expected by 8/17, it was recommended that nothing further be done immediately.
F. Implementation Subcommittee:
Costs. The subcommittee has been discussing whether or not to change the allocation formula that was used for funding the plan development process for the implementation phase of the MSCP. The subcommittee is suggesting that non-Federal MSCP implementation costs be distributed on a state-by-state basis so that each state can decide and control how its share of needed funds are acquired (taxes, user fees, etc.). The state cost distribution rounding (50/30/20) calculation will be re-visited by the Subcommittee at the request of the state of Nevada. The process under consideration for determining future MSCP implementation costs is to begin with current spending on activities that are within the MSCP scope, project that amount forward, then add costs expected for additional species and additional activities.
Structure--A list of requirements for structuring MSCP implementation has been developed. A chart will be sent to members showing current ideas on an implementation structure. One issue is determination of the size of the Board of Directors. It is expected that by using a small board (e.g. five people or so) those key people would likely be far more active and involved than if a large Board (e.g. 45 or 50 people) were selected. The Implementation Subcommittee will meet on 8/20 at the Las Vegas airport. Included in that meeting will be work on design of the processes for dealing with future projects.
G. Long Term Funding Subcommittee: This item was covered under Implementation Subcommittee--Costs.
H. Public Outreach Subcommittee: Draft outreach materials were distributed to the Work Group. These materials, which will evolve and change over time, will be used in presentations and otherwise distributed to provide information about LCR MSCP. Review and comments by Work Group members were requested and are due by 8/13. The revised versions will be available for the 9/3 Work Group meeting.
Fred Worthley/ Alana Knaster will contact American Rivers and the Nature Conservancy to clarify whether or not they would prefer to continue to be listed as MSCP members on the outreach materials. Both organizations have indicated that they cannot actively participate at this time because of staffing time allocation problems.
Agenda Item # 3 - Status of the Vision Paper and Team Discussion
This item was covered under Program Subcommittee.
Agenda Item # 4 - Report on Meeting with the Army Corps of Engineers
Fred Worthley and Jerry Zimmerman met with the US Army Corps of Engineers to discuss their interest in participating in the MSCP process. The COE agreed to review and comment on the materials and presentation and to consider how they might become involved. A request for membership would have to be placed on the Steering Committee agenda in September. The Corps has developed a HydroGeomorphic Methodology (HGM), a model useful for identification of opportune reclamation sites. To date COE has not implemented HGM for the LCR, but part of the discussion with the Corps included whether one might be adapted for the MSCP process.
John Fritsche suggested that, per the direction of the Steering Committee in June, it was now appropriate to contact EPA to ascertain that agency's interest in participating in the MSCP. The Work group designated Jerry Zimmerman and Tom Hine to contact EPA to arrange a presentation and discussion about MSCP and about EPA's potential participation. The goal would be to ask for Steering Committee approval in September for the addition of both agencies.
Agenda Item # 5 - Status of Year 2 Funding
Discussion centered on whether or not Interim Conservation Measures (ICMs) should be continued and funded with MSCP funds. Three possibilities were discussed: (1) MSCP could refresh the ICM project list and continue to use MSCP resources to fund or to match funds for select ICMs. (2) MSCP could select ICM projects, broker and help find funds for them, and recommend them to the Steering Committee, but not supply any MSCP funds. (3) MSCP could discontinue funding ICM projects in favor of some other approach.
The Workgroup discussed the need to balance the benefit of funding ICMs because of the importance of MSCP involvement in ongoing reclamation against the potential problems associated with going back to sponsors for additional funding as this time. It was suggested that brokering funding of ICMs would take considerable effort and might be perceived as taking funds away from other groups or programs. The Workgroup therefore recommended that efforts be directed towards implementing a "Pilot Project" such as changing hydrologic conditions at the Alligator Slough. Phyllis Myers will be asked to find additional funding for such pilot projects.
For the shorter-term, Fred Worthley will ascertain whether or not the remaining MSCP ICM funds ($100,000) will be needed for continuation of the Lake Mojave Project.
Agenda Item # 6 - Report on Riparian Workshop
The major result from this workshop was recognition that MSCP efforts should be directed towards restoration/projects in specific sites where conditions are most appropriate rather than trying to cover longer stretches of the LCR.
Agenda Item # 7 - Protocol for Providing Documents and Action Items to the Steering Committee
The Steering Committee has requested that they not be expected to make decisions and take actions without adequate time and information for preparation. Appropriate and timely documents must go to the Steering Committee in time for preparation for their meetings.
The Workgroup discussed the viability of holding workshops on a number of the complex, technical issues that are going to be considered at upcoming meetings of the Steering Committee. This would enable the Steering Committee to provide some early reactions to proposals to help guide subsequent work of subcommittees and the Workgroup. It would also improve the overall effectiveness of the Steering Committee and reduce the likelihood that issues would have to be revisited because members did not have enough information to vote on a matter. The workgroup will consider holding some workshops as part of a Steering Committee meeting rather than holding special sessions.
Agenda Item #8 Other
Chris Harris reported on his contacts with some of the landowners in the Cibola National Reserve regarding possible land exchanges or purchases. Based upon the information received, the Workgroup decided not to pursue these discussions any further at this time. Alana Knaster noted that she had recently read an article about the Mojave Desert Reserve and other landowners that were attempting to broker land swaps. She will distribute the newspaper article on the Mojave to members.