Revised Meeting Notes
Hydrologic Modeling Subcommittee
8/19/98
I. Intros & Housekeeping
II. Briefing from Bio Subcommittee
BSC Met on 7/30 went over cons. objectives
Will meet again on 9/16, 9/17 in Phoenix
III. Potential Conservation Opportunity Sites & Evaluation Criteria Discussion
The subcommittee accepted recommendations #1, #2, #6 & #7 contained within the Discussion Paper addressing Evaluation Criteria for Pilot Habitat Restoration & Enhancement Projects.
Chris Harris & Andrew Hautzinger will coordinate with Laura Herbranson's office to develop a Rapid Assessment Team strategy consistent with Rec. #6 and focus on approx. 10 of the 49 PCOS sites, based on 1) existence of available data, 2) facilities, 3) Ogden perspectives, 4) Vegetation Mgmt. & 5) species orientation (e.g. Cuckoo), with the understanding that timing is critical
Also move forward with trip of a small group to Bosque del Apache.
IV. Modeling Discussion
The group received a summary of Dan Epstein's paper and discussed the issue of river modeling at length. The discussion ultimately led to a series of nested questions being posed in hopes of breaking the impasse over whether or not to apply the Riverware modeling approach to addressing hydrologic modeling implications on the creation of conservation sites and the opportunities presented by flood releases from Glen Canyon and Lake Mead. The group identified the following questions as critical to further progress of the subcommittee:
1. In the next three years, will we have to examine river operations at a level that requires use of the long-term policy model in Riverware? (the group ultimately came to the conclusion that it did not need to answer "yes" right now.)
2. If yes to 1 above, when do we want to talk about it?
3. Would it be valuable to run and bound (via min and max assumptions re releases (e.g., 6.5 MAF, 7.5 MAF and 8.5 MAF) a 24-month study/model to identify the sensitivity characteristics in specific reaches (so as to determine appropriate conservation strategies)?
4. As a last resort, we may need to use the probability-driven approach to refine the analysis and its outputs.
After extensive discussion and additional commentary by OGDEN and RTi that, in their opinion, failure to apply the model would result in NEPA deficiencies, it was determined that running the 24-month study planning program and a water surface profile model with water delivery schedules of 6.5, 7.5, and 8.5 MAF to Arizona, California and Nevada would provide bounding conditions for determining appropriate conservation strategies. The HMSC would not use Riverware and accept the risk that time delays could result in the overall project if they need to run Riverware at some later date as a precursor to an adequate MSCP and NEPA analysis.
V. Action Items
1. In coordination with Reclamation’s RPA implementation process, review all existing data, literature and other relevant information associated with native riparian revegetation efforts in the southwestern United States, with a specific emphasis on those efforts along the lower Colorado River. A determination should be made regarding the existence of long-term monitoring data associated with site-specific soil and hydrologic (depth to water, groundwater, water quality, etc.) conditions. If adequate data and information exists, it may be possible to rapidly design a pilot revegetation project at the site of an earlier effort.
Action: Contact Mike Walker and Laura Herbranson to determine appropriate strategy to obtain access to this information and data. Also, should coordinate with Andrew Hautzinger (USFWS-R2), Sandra Joyce-Owen (USGS-Tucson). This effort should include coordination with the Ogden Team.
2. The HMSC, Biological subcommittee and Ogden team should formally request the assistance of Reclamation’s Boulder City and Yuma offices in establishing data collection and survey efforts along the lower Colorado River during the period of projected space-building, anticipatory flood control releases and/or flood control releases (October - March??? 1999, and again in 2000). Specifically, hydrologic data (water table depth, connectivity to the river, backwater and old river channel feature conditions, etc.) should be collected at as many of the 49 sites identified by the Ogden team. Data collection protocols should be developed as soon as possible to allow for consistency of data collected in the field, and to allow adequate correlations to be developed. Adequate lead time for planning, staffing, budgetary and logistical purposes associated with this significant effort should be given to Reclamation and other potential participants as soon as possible.
Action: A meeting should be scheduled as soon as possible with USBR-LC and YAO to establish a "rapid assessment team" to design data collection protocols and coordinate data collection efforts and development of appropriate databases.
3. As soon as possible select several sites along the LCR for development and implementation of pilot projects which can be coordinated with and contribute to USBR-LC compliance with the BO and RPA and provide necessary information to the Ogden Team in the development of appropriate conservation alternatives.
Action: Requires additional refinement of site selection and screening criteria, coordination with USBR’s RPA implementation team. Pilot project selection should be drawn from the 49 potential sites identified by the Ogden Team and/or compatible with efforts of USBR’s RPA implementation.
4. A visit to the U.S. Fish and Wildlife Service Bosque del Apache National Wildlife Refuge, located on the Rio Grande River in central New Mexico, should be arranged for early-Fall 1998. The purpose of the visit would be to meet with refuge staff and discuss specific methodologies for salt cedar control and re-establishment of mesquite bosques and cottonwood gallery forest.
Action: Coordinate with Stuart Leon and Andrew Hautzinger at the USFWS Regional Office in Albuquerque, New Mexico. It may not be possible to calendar this trip until mid- to late-October or November 1998.
VI. Next Steps
Next meeting scheduled to take place on Monday Sept/ 28th from 10 AM - 2 PM at either LVVWD offices or Nevada CRC Conf. Room - Final location to be mailed out with these meeting notes next week.