Independent collection of planning records

LCR MSCP home

Work group · October 7, 1997

LOWER COLORADO RIVER MULTI-SPECIES CONSERVATION PROGRAM

Work Group Meeting

Conference Room C

McCarran International Airport

Las Vegas, Nevada

October 7, 1997

Meeting Notes

Agenda Item #1 Welcome and Introductions. Chairman Chris Harris welcomed the group and noted the start of a new phase with the formal addition of the two consultant teams.

Agenda Item #2, Status of Yuma Sedimentation Issues and USBR Proposals, and Item 3 Rescheduling of the Lower Colorado River Tour: These items were deferred for discussion later in the meeting in favor of a discussion of the Letter submitted by John Fritschie regarding the scheduling of Steering Committee and Work Group meetings and other process issues.

Discussion of October 5, 1997 correspondence from John Fritschie of Defenders of Wildlife: Chris Harris summarized the concerns of John Fritschie as outlined in his letter regarding 1) a request to reschedule the meeting times of the Steering Committee and Work Group meetings to fall "back to back" to allow for broader participation of public interest community interests, 2) an acknowledgement of the relative costs associated with meeting attendance, and 3) the postponement of certain agenda items until a later date.

Mr. Harris outlined the reasoning behind the scheduling of the meetings as currently designed and indicated flexibility in terms of modifying the meeting scheduling/structure. Several other Work Group members acknowledged the cost concerns of Defenders of Wildlife and suggested that the role of the Work Group is changing with the initiation of the MSCP Development and Facilitation stages of the process. The Facilitators, John Jostes and Alana Knaster, acknowledged that the process issues raised in Mr. Fritschie’s letter will be addressed during the convening phase and within the context of groundrules. A consensus emerged that it was important to work with Mr. Fritschie and develop a framework for addressing cost, scheduling and other process issues, and directed Mr. Worthley to prepare a response to reflect that consensus.

A meeting of the Work Group was scheduled to follow the October 23, 1997 meeting of the Steering Committee to determine a scope of work for the upcoming six months and a feasible meeting schedule. (As Mr. Chris Harris will be unable to attend the October 23rd meeting, Mr. Phil Lehr will serve as the acting chair for the afternoon Work Group Meeting.)

Chris Harris also announced that Dr. David Garrett head of the Glen Canyon Monitoring and Research Center will make a 1 – 1 ½ hour presentation regarding the Glen Canyon Adaptive Management Process to the Work Group at its November 6th Meeting and invited all interested individuals to attend.

Agenda Item #4 Results of LCR Biological Opinion RPA Implementation Workshop:

RPA #13.a. & 13.b. – Bill Wiesenborn reported that the deadline for comments on RPA #13.a. has been extended to November 19, 1997. In addition, Tom Shrader indicated that Laura Hebranson, Bill Rinne, and LeGrand Neilson will be working on a revised Draft Process for RPA # 13.b. which will be presented at the October 23, 1997 meeting of the Steering Committee.

Razorback Sucker Recovery Plan – Bill Davis reported that the Razorback Sucker Recovery Plan is now out and under review. The Work Group appointed a subcommittee to draft an approach to review and respond to the Razorback Sucker RPA by its January 5, 1998 deadline. The Subcommittee consists of Bill Werner, Bill Davis, Jon Sjoberg, Tom Hine and Janet Monaco. The Ogden Team was invited to participate in this review as appropriate and to suggest how to best coordinate their work with the Plan. Fred Worthley noted that this Subcommittee does not preclude individual States (AZ, CA, or NV) from commenting on the Razorback Sucker Recovery Plan.

Southwestern Willow Flycatcher – Stuart Leon reported that the Southwestern Willow Flycatcher Recovery Team is currently being assembled. A "Core Team" has been appointed consisting of eleven individuals from a 6-state area. The role of the Core Team will be to look at the biological needs of the species and set goals. The Fish and Wildlife Service is also moving quickly toward assembling a State Implementation Team to advise the Core Team regarding the feasibility of implementation at the state level. Mr. Leon invited the participation of the members of the Work Group on an individual level, rather than as a group.

Agenda Item #5 Status of Consultant Contracts:

#5a. SRS Scope of Work: Marty Meisler provided a status report on the SRS Scope of Work and distributed a handout to the Work Group clarifying SRS’s responsibilities. In summary, SRS’s role will be to research potential funding sources and pursue those funding sources. Their Scope of work does not include lobbying efforts. The Work Group was provided with the option of contracting separately with SRS or having their services handled within the Ogden Contract as originally proposed. It was the consensus of the Work Group to handle the contract separately. Fred Worthley will communicate this decision to Whitney Tilt with the National Fish and Wildlife Foundation. Copies of the contract should be sent to each state and USFWS.

#5b. – Consultant Introductions/Presentation by Ogden: Mike White provided the Working Group with an overview of the type of information the Ogden Team is seeking in this initial request. In summary, Ogden seeks a list of data availability from each participant, indicating the type, title, and date of the available information, its format (digital or otherwise), geographical reach, and relation to specific species, as well as a point of contact for that data. Ogden is not seeking the data itself at this time, only a listing of who has what, or a given agency’s knowledge of the location of relevant data, whether or not that data is the property of the commenting agency. Dr. White also requested that individuals indicate next to the bullets of his two-page memo any bibliographical sources or other individuals who may have knowledge of the location or existence of relevant information. Marty Meisler requested that the Ogden Team provide a more detailed schedule with regard to the first phase of data collection.

The Group determined that the most efficient manner to transmit this data was to provide it directly to Ogden with copies to Fred Worthley by October 17th.

Additional discussion took place over the following technical issues:

Definition of the Project Area: The work group will rely upon Ogden’s professional judgement for a clear definition of the project area; such a designation would include but not be limited to the 100 year flood plain of the main stem, full pool elevations of reservoirs (e.g. Lake Mead), and the extent to which the 100 year flood plain elevation of the main stem reaches up tributaries. The Bureau of Reclamation encouraged a definition of the project area that would cover a breadth of species, rather than one that would be a limiting factor. The product of this effort will be a map and criteria listing for Work Group review and comment.

GIS Database Structure and Design: Ogden representatives indicated a desire to convene a Geographic Information Systems (GIS) Subcommittee comprised of technicians as soon as possible after the October 17th deadline for database comments. In response, the Work Group outlined the role of the GIS Subcommittee to focus on issues of scale, spatial attributes, hardware requirements and related matters. Marty Meisler, Bill Davis and Janet Monaco expressed interest in serving on the Subcommittee. The Work Group Chair requested Marty Meisler to serve as the chair of the subcommittee and to add additional stakeholders to the Subcommittee.

Joint Meeting of Biological and GIS Subcommittees: Ogden Representatives requested that a joint meeting of the Biological Subcommittee and the GIS Subcommittee be scheduled to discuss project needs and issues of common interest. It was acknowledged that this would be the proper forum for discussing the additional issues raised by Ogden, including:

Habitat Classification System;

List of Target Species and priority actions;

Criteria for Species coverage; and,

Threats to Species.

The Work Group concurred with the suggestion of a joint meeting and scheduled it for November 6th, following the presentation on the Glen Canyon. In that the November 6th Work Group meeting is scheduled for conference Room "A" at McCarran Airport, Bill Wiesenborn suggested a conference call between the GIS Subcommittee to reserve a meeting room with greater capacity, preferably, the Commissioner’s Room or another similarly sized meeting room.

Agenda Item #6 1998 Work Group Meeting Dates: The tentative list of meeting dates for the Steering Committee and the Work was distributed to those present, with the understanding that such a schedule should not preclude grouping meetings of the Work Group to follow those of the Steering Committee, where appropriate. It was acknowledged that the distributed calendar should be revised to indicate the start of Work Group meetings at 8:30 am for those dates already reserved.

Agenda Item #7 Status of September 10-11, 1997 Glen Canyon AMWG Meeting and October 2-3, 1997 AMWG Technical Work Group Meetings: Issues covered under previous agenda items, above.

Agenda Item #8 Status of Scientific Peer Review for LCR MSCP: Larry Purcell summarized a draft memorandum and handout regarding the establishment of a Scientific Peer Review Process and requested the Work Group to forward to the Steering Committee a recommendation to establish a peer review panel, approve guidelines and initiate the convening of the review panel. He requested comments on his memo and its attachment from the Work Group by October 16th. A broad-ranging discussion of the role of the Scientific Peer Review panel ensued and the Work Group as a whole acknowledged that its primary role was to focus on criteria and methodologies as a first phase of its work. The Work Group recommended by consensus that the Steering Committee provide direction regarding whether or not a peer review panel should be established.

Agenda Item #9 Discussion of LCR MSCP Bylaws: Alana Knaster made a presentation to the Work Group on protocol language defining consensus and on groundrules. Members of the Work Group were asked to review a series of handouts providing a variety of definitions and protocols to enhance the group’s understanding of a variety of issues including:

  • What to do when consensus is not possible;
  • How interest caucuses function during single meetings or in other special circumstances;
  • Options for proxy voting in the absence of individual participants; and,
  • The importance of Groundrules as operating procedures.

Ms. Knaster and John Jostes responded to questions and comments raised by Work Group Members regarding options for the decision-making process.

Agenda Item #10 Long Term LCR MSCP Funding: In consideration of the long lead times for federal budgetary processes, Chris Harris suggested to the Work Group that a small ad-hoc group be established to anticipate and address funding and financing issues related to funding and implementation of the MSCP beyond the year 2000 - 2001. The Work Group established by consensus such a Subcommittee and encouraged it to address issues including: 1) the federal budgetary process in relation to the LCR MSCP, and 2) future funding allocation issues among states. Fred Worthley, Tom Hine, Chris Harris, Bill Grossi, Richard Thiery and Marty Meisler expressed interest in serving on the Subcommittee and extended an invitation to other Work Group members to participate in the Subcommittee’s work.

Agenda Item #11 Steering Committee Requests:

  1. USFWS Lower Colorado River Ecoregion Team Status: Discussion Deferred until next Work Group Meeting
  2. "Bring Back the Natives" Grant Proposal
  3. . Marty Meisler provided the Work Group with a handout of relevant grant proposal material. No formal action was taken on this item.
  4. Annual Report - Year 1 ICMs:
  5. Marty Meisler proposed that a report be prepared for this year and for each subsequent year on where the ICM moneys have been spent and whether these expenditures have been effective. Initial funding levels are $100,000 from USFWS and $100,000 from the Bureau of Reclamation. Bill Wiesenborn indicated that he will coordinate with Bill Werner, Jon Sjoberg and Marty Meisler in an attempt to report where the money has been spent and what value/benefits have been derived.
  6. Compilation of GIS Data:
  7. Item Covered under previous Agenda Items above.
  8. Conservation Activities Catalog:
  9. Marty Meisler reported that a Catalog of Planning, Conservation and Related Activities will be developed which lists all completed, in progress and planned projects along the LCR MSCP project area.

12. Adjourn: The meeting was adjourned at 2:55 P.M.

"To Do" List/Action Items

  • Schedule Work Group Meeting to Follow 10/23 Steering Committee Meeting and prepare agenda to guide discussions.
  • Schedule Work Group Discussion of Emerging Roles and Responsibilities, and Meeting Timing and Scheduling.
  • Comments due on RPA 13A and suggestions re RPA 13 B (November 19th )
  • Fred Worthley to draft a Response Letter outlining Work Group’s Perspectives on Issues Raised by John Fritschie
  • Provide List of Available Data to Ogden with copies to Fred Worthley (October 17th)
  • Ogden to provide work Group with Detailed Schedule regarding Data Collection
  • Review handouts provided by Facilitators on Consensus Language and Groundrules
  • Finalize Meeting Location for November 6th Work Group Meeting in order to obtain use of a meeting room with larger capacity
  • Provide Comments on Scientific Peer Review Memo to Larry Purcell by October 16th.
  • Schedule Conference Call to initiate Long Term Finance Strategy/Implementation subcommittee work on October 16th.