Meeting record · November 9, 1998

DRAFT MEETING NOTES

IMPLEMENTATION AND LONG TERM FUNDING SUBCOMMITTEE

November 9, 1998

Phoenix, AZ

1. Approval of Meeting Notes from October 5, 1998 Implementation/LTF Subcommittee

The Subcommittee deferred action on the meeting notes based upon the absence of individuals who had raised specific concerns with the meeting notes.

  1. Discussion of Outstanding Tasks and Schedule for Funding and Financing:

Jun Onaka outlined the substance of his memo and outlined four areas on which the Subcommittee needs to strategize. Some of the points of discussion were as follows (ref. to Handout entitled LCR MSCP Funding and Financing Strategies Major Outstanding Tasks and Schedule dated 11/5/98):

Item 1: Implementation cost estimating and budgeting is contingent on finalizing conservation strategies but the subcommittee needs to discuss these factors beforehand in order to identify costs as best as it can ASAP.

Bill Davis noted that upper basin efforts to date have included efforts to address bottomlands acquisition. These may be helpful in identifying some programmatic costs.

Tom Hine noted that the Bureau of Reclamation (USBR) has done a lot with respect to acquisition and their efforts re RPAs.

The Subcommittee agreed that once the Conservation Opportunities Report has been released (est. for next week) specific conservation actions can be discussed with Mike Walker of the Boulder City Office of USBR to get a better handle on cost projections. In the interim, Ogden will create and distribute a list of cost categories and agency contacts to assist in this task (see Action Item #1 below). Jerre Stallcup and Mike White agreed to meet with Jun Onaka and Mike Walker to discuss costs associated with specific conservation opportunities (See Action Item # 2 below).

Item 2: Allocation and Sources of Funds for Long Term Implementation: The Subcommittee discussed a variety of methods and assumptions regarding the sources of and allocation of long term funds including the following:

    • Deferral of payments to write down capital costs of dams and power generation facilities as a possible environmental restoration funding source;
    • Allocate long term costs on the basis of water deliveries, acknowledging that it is difficult to get a handle on how to put a dollar value on US FWS uses of water.
    • Need to look at US ACE figures (65/35 Federal/Non-Federal split) for their restoration efforts as a possible scenario.

It was acknowledged by a number of committee members that because of long lead times associated with the federal funding cycle, that it is critically important for the MSCP to get started in terms of addressing and resolving these funding issues so that the financial resources are available for implementation. The key short-term task at hand for the Subcommittee is to get buy-off from the Work Group and the Steering Committee on the assumptions and principles of the Financing Plan by the February and April meetings, respectively, of those entities.

Jun Onaka indicated he will look at alternative split formulas and determine the nature of the logic behind those various formulas and report back to the Subcommittee at its next meeting (see action Item #3, below).

The Subcommittee acknowledged the need to bring this matter to the Work Group for action at its February 11, 1998 meeting.

Item #3: Funding of Ongoing Conservation Activities: Issues related to funding of Interim Conservation Measures (ICMs) and the Bring Back the Natives (BBTN) program were discussed; the observation was made that no single individual currently has the time or ability to fill out the actual grant applications to provide for continuing funding sources for these projects. Also important is the development of a decision making process and schedule for implementing short-term funding activities associated with conservation measures.

The subcommittee noted that continued uncertainty as to who is responsible for filling out grant applications regarding ICMs and the BBTN program is beyond the purview of the Long Term Funding Subcommittee. This requires consideration and resolution by the Work Group (see Action Item #4)

Item #4: Supplemental Funding of MSCP Plan Development: Marty Meisler updated the Subcommittee on discussions that took place at the Work Group meeting held on November 5 (see Work Group Meeting Notes).

3. Continued Discussion of "Housing" the Long term Implementation Structure

Chris Harris distributed copies of a paper he had developed entitled "Proposed Responsibilities/Authorities for the LCR MSCP Implementation Entity". He highlighted the 11 duties and responsibilities covered within the paper as well as the 9 authorities suggested. He noted that the intention of an Implementation Entity (IE) should be to function as the representative of the Program. Considerable discussion took place regarding whether the IE should be housed in the Federal Government (e.g. with the Exec. Director as a DOI employee or subcontractor) or within a non-federal context, i.e., through a contractual arrangement with a third party (e.g. National Fish & Wildlife Foundation). Subcommittee members made a number of observations including:

  • The LCR MSCP situation requires a different approach to that which is currently taken by the three DOI Under-Secretaries, where, for example, the US Bureau of Reclamation puts up the majority of the funding. (ref. to Upper Colorado River and Cal Fed).
  • The USBR has a preference to see the Exec. Director housed within the federal Gov’t managing federal funds, scopes of work, involved in river management and given the flexibility to work closely with the states.
  • Funds to underwrite the program may not need to exchange hands but can be credited from the states to the feds, through memoranda of understanding or other cooperative agreements.
  • The Exec. Director needs to be able to facilitate and manage the implementation aspects of the program.

A series of concerns were raised with regard to the Federally housed approach. Specifically, four questions need to be answered for consensus to emerge with regard to the Federal approach:

  • What kinds of assurances need to accompany the issuance of the permit? (i.e., who holds the permit to take in comparison to the users of the water?)
  • What kind of assurances can be given that the permit will last for 50 years? (what guarantees exist that if new species or conditions are identified, that the permit will not be withdrawn or invalidated?)
  • How do the states assure that the funding is spent appropriately (i.e., effectively and responsibly), or at the very least that the states have some say in how it is spent?
  • How will the states get assurances that (a) the program will go forward as expected, (b) that the program is "successful" and does not fail?, and, c) that failure by one entity to meet its obligations does not put another entity at risk (No surprises).

In responding to these and other concerns, several subcommittee members acknowledged that the program may well end up housed in the federal government because the states do not have the ability to mandate federal actions. It was suggested that the degree of comfort with a federally housed implementation structure is a matter of what quality of assurances can be provided to the states to balance the issues of risk, certainty and cost over the long term. Concern was voiced that the US FWS could identify unforeseen circumstances in terms of newly designated endangered species that would violate the intentions of the program regarding certainty.

Related issues centered on the States’ oversight over the Executive Director. It was suggested that if the individual in the ED position did not follow the states’ direction that a process was needed so that the Executive Director was held accountable and required to explain the basis and reasoning behind their actions. Additional comments were made that power and water users are impacted differently by the overall implementation program over time.

The Subcommittee took a Lunch recess from 12:15 – 1:30 pm. without resolving the issue.

4. Discussion of List of Desired Assurances

David Moser of McCutchen Doyle, Brown & Enersen distributed "LCR MSCP: List of Desired Assurances (Revised)" Moser (11/9/98) and summarized his most recent revisions to paper. He noted refinements to sections I-B, I-D, I-E, I-F, I-H, I-I, and Section II. These changes related to Arizona’s endangered species laws need to be integrated into the MSCP so that Arizona can get the same relative level of assurances that California does with regard to the existence of both federal and state statutes, and related to the need to specify that costs associated with the US FWS identifying new conservation measures whose costs would be borne by the feds, not the states. In addition, the concept of severable contracts was replaced with ensured funding. With regard to Item II, Bill Davis suggested language limiting consultation to the term of the MSCP. No major changes were made to Section III.

There was considerable discussion over the constraints of discovery of new species and the resultant Section 7 consultations necessary when conditions are imposed by the federal government. It was noted that while the Federal government is responsibility for paying for these consultation costs, the resulting conditions could change the operations of the River itself and have implications on Power entities and their rate payers. Dave Moser indicated he would review the list of assurances in the context of the Boulder Canyon Project Act to make sure that no inconsistencies would result from the assurances forged by the MSCP Implementation Agreement (See Action Item #5, below).

The subcommittee requested that the last sentence from Section I-H be added to the end of Section I-A. As revised, that section concludes with the sentence:

"Compliance with any RPMs or RPAs which go beyond the conservation measures provided in the MSCP shall be the sole responsibility of the federal government, and all associated costs shall be borne by the federal government and not passed through to non-federal MSCP participants. "

The recommendation was supported by consensus of the Subcommittee.

Sam Spiller of the Fish and Wildlife Service expressed strong support of the approach being taken through the List of Desired Assurances. He suggested that it would be important to get it reviewed by lawyers within the Solicitor’s Office so that any differences of opinion can be resolved immediately without holding up the matter from action at the Work Group and Steering Committee levels. He volunteered to expedite its internal review by representatives of the Solicitor’s office and coordinate those efforts with Tom Shrader as appropriate. (See Action Item #6 below)

The Subcommittee expressed as a consensus viewpoint that the List of Desired Assurances is fundamental to MSCP implementation and endorsed its refinement and adoption as an important step. The subcommittee also established a two week deadline for comments being submitted to David Moser so that a revised draft can be presented to the Work Group at its December 3, 1998 meeting. (See Action Items #7 & #8 below).

Chris Harris noted that stakeholder support of the List of Desired Assurances will be an important first step that will facilitate crafting a workable Implementation Agreement, particularly in terms of where the implementation framework is housed.

The meeting was adjourned at 2:50 PM, Mountain Standard Time

ACTION ITEMS

  1. Ogden will create and distribute a list of cost categories and agency contacts related to specific conservation opportunities. (to be undertaken immediately)
  2. Ogden and Jun Onaka to meet with Mike Walker to discuss RPA and other funding expenditures as inputs into their cost estimation efforts and provide a briefing /summary report to the Subcommittee for discussion at their next meeting (January 8, 1998).
  3. Jun Onaka to review Chris Harris’ paper and US Army Corps of Engineers experience with restoration funding allocation and report back to the Subcommittee at their next meeting. This information will be used to craft a set of assumptions and principles of the Financing Plan regarding cost allocation for transmittal to the Work Group Meeting in February and for action by the Steering Committee at their April 1999 meeting.
  4. The Subcommittee requests that the Work Group review and determine the need to address Interim Conservation Measures funding, Grant Development and related short-term funding issues beyond the immediate focus of the Implementation/Long Term Funding Subcommittee
  5. David Moser to review the draft List of Desired Assurances in the context of the Boulder Canyon Project Act to determine if any conflicts exist with regard to funding or the list of desired assurances.
  6. Sam Spiller to identify and contact appropriate representatives within the Solicitor’s Office of the Department of Interior and obtain feedback from each agency regarding the Draft List of Desired Assurances. (to be coordinated with Tom Shrader).
  7. Set a two (2) week deadline (November 23, 1998) for submitting preliminary comments to David Moser regarding the List of Desired Assurances.
  8. Endorsed the concept of a List of Desired Assurances as an important component of the MSCP process.

MEETING SCHEDULE

  • The next meeting of the Implementation/Long term Funding Subcommittee has been scheduled for 9:00 am January 8, 1999 at McCarran Airport, Las Vegas, Room TBA
  • A follow-up meeting has been scheduled for February 8, 1999 at 9:30 in the 3rd Floor Conference Room of Arizona DWR in Phoenix.